SDLL Bridge | Redwood Films

SDLL Bridge over the Lydsey Rife

Video Production Services



red films logo 300x75Redfilmstelno 2


Time-lapse of the construction of a bridge in Sussex over a rife or drainage channel. It was delivered in parts like Meccano as the site was unsuitable to bring in a fully constructed bridge. Then the team from Reid Steel set to work to put it together. Once built it was then pulled across the rife using winches.
It's a technique often used when there is no access to heavy lifting equipment but lots of manpower!
It was shot using a GH4 & XF305 over a week in August 2015.
The copyright is owned by Sime Darby (London) Ltd.

<< BACK